Wednesday, 17 June 2009

Recent Borehole Install at Cluny, Laggan


The property just prior to borehole drilling
for the new water supply:




Welding the steel casing during drilling of the borehole:




The top of the borehole can just be seen just to the right of
the roll of blue water pipe:




Backfilling the submersible storage tank:




Excavating the trench between the borehole and the house.
This will take water to the house from the borehole and power from the
house to the borehole shed:




The plinth for the borehole shed, showing the top of
the storage tank and the top of the borehole:




The new borehole shed:




Inside the borehole shed before treatment systems
are installed. The top of the borehole is visible at
the back of the shed:



The borehole shed with the treatment (sediment
filter, Ultraviolet steriliser and pump control equipment)
installed. A frost heater protects the equipment in winter:


The job nearly complete:


All finished and re-landscaped:


Time to go home!

Borehole Drilling

Our new Dando MTEC-6 drill rig in action:









Meet the Staff



Jeff




Mike




Warwick and Hamish




Duncan


Wednesday, 3 June 2009