The property just prior to borehole drilling
for the new water supply:
Welding the steel casing during drilling of the borehole:
The top of the borehole can just be seen just to the right of
the roll of blue water pipe:
Backfilling the submersible storage tank:
Excavating the trench between the borehole and the house.
This will take water to the house from the borehole and power from the
house to the borehole shed:
The plinth for the borehole shed, showing the top of
the storage tank and the top of the borehole:
The new borehole shed:
are installed. The top of the borehole is visible at
the back of the shed:
filter, Ultraviolet steriliser and pump control equipment)
installed. A frost heater protects the equipment in winter:
The job nearly complete:
Time to go home!